Address sewer constraints before work advances
Drainage position considered
We show the relationship between the proposed building and public sewer.
Foundation details aligned
We coordinate relevant structural information with the utility drawings.
Submission scope explained
We organise the drawing information needed for Thames Water review.
Identify drainage constraints during early design
An extension or other structure close to a public sewer may require a build over application before relevant construction proceeds. We help establish how the proposed work relates to the known drainage position and prepare drawings for Thames Water where required. The submission information can show the proposed foundations, sewer location and separation between the structure and drainage. Considering this early matters because a sewer constraint may affect the extension layout, foundation approach or information needed from other project contributors.


Coordinate the submission with the building design
Utility drawings should refer to the same proposal as the architectural and structural package. We coordinate relevant dimensions, foundation information and drainage relationships so the submission does not sit apart from the rest of the design. Thames Water reviews the application and controls its decision and any further requirements. Our role is to prepare clear submission drawings, organise available property information and help you understand how the build over process connects with planning and Building Control stages.
Frequently asked questions
When might we need a Thames Water build over application?
You may need one where proposed work crosses or sits close to a public sewer. The drainage position, type of work and applicable requirements determine the route, so the relationship should be reviewed during design.
What information can the submission drawings show?
The drawings can show the proposed structure, foundations, known sewer position and the relationship between the building and drainage. The precise package depends on the property and the authority's requirements.
Does a build over application replace other approvals?
No. It addresses the water authority's requirements for work near a public sewer. Planning permission, Building Regulations approval and structural information are separate matters that may also apply to your project.
